Refinery turnaround
Streamlining material management during a $120M refinery turnaround
Background
PMM supported a $120M turnaround project at Phillips 66 in Carson, CA, managing over $30M in materials. The refinery faced challenges with material loss, inefficiencies, and lack of visibility during turnarounds, leading to cost overruns and delays.
Challenges
- Material loss and waste. Lack of accountability resulted in a 23% loss from theft, waste and mismanagement.
- Productivity issues. Workers had to leave job sites to retrieve materials, causing delays and reduced productivity.
- Labor costs. High labor costs with minimal output due to inefficient workflows.
Solutions implemented
- EZTRAK integration. Deployed real-time inventory tracking with centralized reporting for material visibility.
- Material kitting and tagging. Prepped and delivered kits directly to workers at job sites, eliminating downtime.
- Optimized labor deployment. Reduced required labor by 33%, reallocating resources to high-value tasks.
Results
- Cost savings
- $6.9M
- Labor efficiency
- $200K
- Productivity gains
- 35%
- Operational excellence
- Benchmark
Material loss and waste reduced by 23%, in hard cost savings.
Saved by executing the same scope with two-thirds of the workforce.
Higher worker efficiency, cutting delays and increasing throughput.
Seamless material management, setting the standard for future turnarounds.
Get a quote
Tell us what you are counting, and we will tell you what it is costing you.